Approved document 7
The building regulations establish standards to be achieved in the construction of buildings. Approved documents provide guidance for how the building regulations can be satisfied in common situations.
Approved Document 7: materials and workmanship, supports regulation 7 of the building regulations, requiring the carrying out building work using the proper materials and in a workmanlike manner.
The latest edition, updated to reflect changes in the Construction Products Regulations, was published on 3 January 2013 and came into force on 1 July 2013. It applies to building works in England.
Regulation 7 requires that building work is carried out:
- With adequate and proper materials which:
- Are appropriate for the circumstances in which they are used,
- Are adequately mixed or prepared, and
- Are applied, used or fixed so as adequately to perform the functions for which they are designed; and
- In a workmanlike manner.
The approved document's contents include:
- Summary.
- Continuing control.
- Interaction with other legislation.
- Regulation 7 of the Building Regulations.
- Performance and limitations.
- Performance.
- Limitations.
- Ways of establishing the fitness of materials.
- Short-lived materials.
- Materials susceptible to changes in their properties.
- Section 2: Workmanship.
- Ways of establishing the adequacy of workmanship.
Following the Grenfell Tower Fire, a decision was taken to ban combustible materials in the cladding for buildings over 18m in height. The following change to approved document 7 came into force on 21 December 2018.
The Building Regulations restrict the use of combustible materials in the external walls of certain buildings over 18m in height. Refer to regulation 7(2) of the Building Regulations and to Approved Document B: volume 2, part B4 for details. |
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.